{"id":9210,"date":"2026-11-23T01:00:00","date_gmt":"2026-11-23T00:00:00","guid":{"rendered":"https:\/\/biax-flexwellen.de\/prufintervalle-flexible-welle\/"},"modified":"2026-11-23T06:31:20","modified_gmt":"2026-11-23T05:31:20","slug":"prufintervalle-flexible-welle","status":"publish","type":"post","link":"https:\/\/biax-flexwellen.de\/en\/prufintervalle-flexible-welle\/","title":{"rendered":"Inspection Intervals for Flexible Shafts: How to Set Them"},"content":{"rendered":"<\/p>\n<p>No single inspection interval applies to every flexible shaft. The interval follows from the load spectrum, the routing, the duty cycle and the consequence of a failure. Manufacturer manuals for shaft-driven equipment show how widely it varies: from a visual check before every use to a service after several hundred operating hours. For a design or aerospace engineer, the practical task is to derive the interval from the failure modes of the specific installation and to document it in the inspection plan. This article shows how.<\/p>\n<div data-blg-cta=\"after_tldr\" data-blg-cta-layout=\"strip\" style=\"margin:28px 0;font-family:-apple-system, BlinkMacSystemFont, 'Segoe UI', Roboto, Helvetica, Arial, sans-serif\">\n<div style=\"border-radius:26px;padding:min(14px,3.2vw)\">\n<div style=\"background:#ffffff;border-radius:18px;overflow:hidden\">\n<div style=\"flex-wrap:wrap;align-items:center;gap:16px 22px;padding:20px 24px\">\n<div style=\"flex:1 1 260px;min-width:0\">\n<div style=\"margin:0 0 8px\"><span style=\"max-width:100%;border-radius:999px;padding:6px 13px;font-size:12px;font-weight:800;letter-spacing:0.1em;text-transform:uppercase;line-height:1.3;background:#1F2937;color:#ffffff\">Biax-flexwellen<\/span><\/div>\n<div style=\"font-size:19px;font-weight:800;line-height:1.2;letter-spacing:-0.01em;color:#1f2937;margin:0\">Specify Shafts Around Application Needs<\/div>\n<div style=\"font-size:14px;line-height:1.5;color:#64748b;margin-top:4px\">Explore BIAX flexible shaft and drive solutions for demanding applications, with configurations shaped around torque, speed, interfaces and shaft design.<\/div>\n<\/div>\n<div style=\"flex:0 1 auto;min-width:0\"><a href=\"https:\/\/biax-flexwellen.de\/\" style=\"align-items:center;gap:9px;border-radius:10px;font-weight:700;font-size:15px;text-decoration:none;padding:13px 22px 13px 26px;background:#1F2937;color:#ffffff\">Visit<\/a><\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<h2 id=\"tldr\">TL;DR<\/h2>\n<ul>\n<li>A flexible shaft has no general inspection interval. It is derived from torque, speed, bend radius, motion of the route, environment and failure consequence.<\/li>\n<li>Published manufacturer manuals range from a daily check of the casing to lubrication every 500 operating hours, depending on the equipment.<\/li>\n<li>The inspection plan should name the characteristics to check: casing, end fittings, core windings, lubrication state and running behavior.<\/li>\n<li>Spare shafts need controlled storage: dry, clean, protected against deformation, and handled first in, first out.<\/li>\n<li>Interval, acceptance criteria and spare quantities are best fixed together in the specification stage.<\/li>\n<\/ul>\n<h2 id=\"table-of-contents\">Table of Contents<\/h2>\n<ul>\n<li><a href=\"#why-no-general-interval-exists\">Why no general interval exists<\/a><\/li>\n<li><a href=\"#factors-that-set-the-interval\">Factors that set the interval<\/a><\/li>\n<li><a href=\"#what-the-inspection-plan-should-check\">What the inspection plan should check<\/a><\/li>\n<li><a href=\"#reference-values-from-published-manuals\">Reference values from published manuals<\/a><\/li>\n<li><a href=\"#aerospace-installations-what-changes\">Aerospace installations: what changes<\/a><\/li>\n<li><a href=\"#lubrication-and-operating-hours\">Lubrication and operating hours<\/a><\/li>\n<li><a href=\"#setting-the-interval-in-practice\">Setting the interval in practice<\/a><\/li>\n<li><a href=\"#storage-and-spare-shafts\">Storage and spare shafts<\/a><\/li>\n<li><a href=\"#relevant-biax-product-lines\">Relevant BIAX product lines<\/a><\/li>\n<li><a href=\"#perspective\">Perspective<\/a><\/li>\n<li><a href=\"#faq\">FAQ<\/a><\/li>\n<li><a href=\"#contact\">Contact<\/a><\/li>\n<li><a href=\"#sources\">Sources<\/a><\/li>\n<\/ul>\n<h2 id=\"why-no-general-interval-exists\">Why no general interval exists<\/h2>\n<p>A flexible shaft consists of a wound wire core that transmits torque and rotation, usually inside a protective sheath or casing. Wear and fatigue arise in the core windings, in the contact between core and casing, and at the end fittings. How fast these progress depends almost entirely on the installation.<\/p>\n<p>Two shafts of the same type can therefore need very different intervals:<\/p>\n<ul>\n<li>A hand-held finishing drive that runs several hours per shift, with the casing bent at changing radii, loads the core in alternating bending and torsion.<\/li>\n<li>An actuation shaft in a fixed, protected routing that turns a few hundred revolutions per operation sees a different damage mechanism: little rotation, but high torque peaks and long standstill periods.<\/li>\n<\/ul>\n<p>For this reason, a fixed interval taken from another application is a weak basis. The interval is a result of the analysis of the load case, not an input.<\/p>\n<p>In regulated aerospace environments the picture is further structured. The interval for a given shaft on a given aircraft type is set in the maintenance program of that type, based on the failure analysis and the criticality of the function. The principle for a design engineer remains the same: the interval comes from the failure mode and its consequence.<\/p>\n<h2 id=\"factors-that-set-the-interval\">Factors that set the interval<\/h2>\n<p>The following inputs should be recorded before an interval is proposed. They are the same data a shaft specification needs anyway, so collecting them once serves both the design and the inspection plan.<\/p>\n<table>\n<thead>\n<tr>\n<th>Input<\/th>\n<th>Why it matters for the interval<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Transmitted torque and peak torque<\/td>\n<td>Peaks accelerate wire fatigue and can cause winding gaps or core set.<\/td>\n<\/tr>\n<tr>\n<td>Speed and operating hours or cycles per year<\/td>\n<td>Defines the number of load cycles; hours suit continuous rotation, cycles suit actuation.<\/td>\n<\/tr>\n<tr>\n<td>Minimum bend radius and number of bends<\/td>\n<td>Tighter bends increase friction, heat and fatigue in the core.<\/td>\n<\/tr>\n<tr>\n<td>Static or moving routing<\/td>\n<td>A moving route adds repeated flexing at the same casing positions.<\/td>\n<\/tr>\n<tr>\n<td>Temperature range and media<\/td>\n<td>Heat, cold, fluids and dust change lubricant behavior and casing material aging.<\/td>\n<\/tr>\n<tr>\n<td>Vibration environment<\/td>\n<td>Affects fixings, end fittings and clamps.<\/td>\n<\/tr>\n<tr>\n<td>Consequence of failure<\/td>\n<td>Determines whether a time-based, condition-based or redundant concept is used.<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>A useful method is to classify the function. If failure only stops a finishing step, a condition-based approach with inspection at defined operating hours is usually sufficient. If failure affects a safety-relevant function, the shaft needs a defined interval, defined acceptance limits and often a redundant or monitored architecture. The related article on <a href=\"https:\/\/biax-flexwellen.de\/en\/flexible-welle-ausfallursachen\/\" target=\"_blank\" rel=\"noopener\">flexible shaft failure causes and aerospace root cause clues<\/a> covers the damage mechanisms that feed this analysis.<\/p>\n<h2 id=\"what-the-inspection-plan-should-check\">What the inspection plan should check<\/h2>\n<p>An inspection plan is only as good as its characteristics. Derive them from the construction of the shaft and from the damage patterns that occur, not from a generic checklist. For a flexible shaft assembly, the characteristics fall into five groups.<\/p>\n<h3 id=\"casing-or-protective-sheath\">Casing or protective sheath<\/h3>\n<p>Look for cuts, holes, loose ferrules, permanent kinks and flattened sections. A manufacturer manual for shaft-driven concrete equipment requires a daily check of the casing for cuts, holes, loose ferrules and permanent kinks, and replacement of the casing where these are found (<a href=\"https:\/\/service.multiquip.com\/pdfs\/Vibrator_Flex_Shaft_Identification.pdf\" rel=\"nofollow noopener noreferrer\" target=\"_blank\">technical information, vibrator flex shaft<\/a>). The daily frequency reflects a rough construction-site duty cycle. For an installed industrial or aerospace shaft the principle carries over, the frequency does not.<\/p>\n<h3 id=\"core\">Core<\/h3>\n<p>The core is checked for broken wires, permanent deformation and heat damage such as discoloration. The same manual places the core inspection at the 100-hour service and requires a new core where such findings appear (<a href=\"https:\/\/service.multiquip.com\/pdfs\/Vibrator_Flex_Shaft_Identification.pdf\" rel=\"nofollow noopener noreferrer\" target=\"_blank\">technical information, vibrator flex shaft<\/a>). Another operating manual, for a pipe-milling machine, states that gaps between windings along the length mean the complete shaft is to be replaced (<a href=\"https:\/\/www.picotegroup.com\/hubfs\/Operating%20Manuals\/Maxi%20Miller%20Operating%20%26%20Safety%20Manual%20-%20March%202025.pdf\" rel=\"nofollow noopener noreferrer\" target=\"_blank\">operating and safety manual, March 2025<\/a>).<\/p>\n<h3 id=\"end-fittings-and-couplings\">End fittings and couplings<\/h3>\n<p>Check the seat of the fitting on the core and the casing, the condition of square, hex or keyed drive ends, and play in the coupling. The same pipe-milling manual calls for a weekly check that the shaft sits firmly under the hand cover at the machine end (<a href=\"https:\/\/www.picotegroup.com\/hubfs\/Operating%20Manuals\/Maxi%20Miller%20Operating%20%26%20Safety%20Manual%20-%20March%202025.pdf\" rel=\"nofollow noopener noreferrer\" target=\"_blank\">operating and safety manual, March 2025<\/a>). Loosening at the end fitting is a typical early finding.<\/p>\n<h3 id=\"lubrication-state\">Lubrication state<\/h3>\n<p>Check whether the lubricant is present along the length, whether it has separated or hardened, and whether it has escaped at the ends. More grease is not better: one manufacturer calls for only a light layer of lubricant and notes that over-greasing causes overheating and early wear (<a href=\"https:\/\/service.multiquip.com\/pdfs\/Vibrator_Flex_Shaft_Identification.pdf\" rel=\"nofollow noopener noreferrer\" target=\"_blank\">technical information, vibrator flex shaft<\/a>). The pipe-milling manual limits relubrication to a maximum of 50 ml, since too much grease loads the shaft (<a href=\"https:\/\/www.picotegroup.com\/hubfs\/Operating%20Manuals\/Maxi%20Miller%20Operating%20%26%20Safety%20Manual%20-%20March%202025.pdf\" rel=\"nofollow noopener noreferrer\" target=\"_blank\">operating and safety manual, March 2025<\/a>).<\/p>\n<h3 id=\"running-behavior\">Running behavior<\/h3>\n<p>Record torque, temperature, noise and smoothness of the output rotation. A rise in drive torque for the same load, or a cyclic fluctuation at the output, often appears before visible damage. Comparing these readings with the values from the first-article test turns them into an acceptance criterion rather than an impression.<\/p>\n<h2 id=\"reference-values-from-published-manuals\">Reference values from published manuals<\/h2>\n<p>The following values show the range in published operating instructions for equipment with a flexible shaft. They are reference points from other applications, not recommendations for a specific installation.<\/p>\n<table>\n<thead>\n<tr>\n<th>Source type<\/th>\n<th>Check<\/th>\n<th>Frequency<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Manual, concrete vibrator<\/td>\n<td>Casing for cuts, holes, loose ferrules, kinks<\/td>\n<td>Daily<\/td>\n<\/tr>\n<tr>\n<td>Manual, concrete vibrator<\/td>\n<td>Core for broken wires, deformation, overheating<\/td>\n<td>At 100 h service<\/td>\n<\/tr>\n<tr>\n<td>Manual, pipe-milling machine<\/td>\n<td>Shaft for damage<\/td>\n<td>Before each use<\/td>\n<\/tr>\n<tr>\n<td>Manual, pipe-milling machine<\/td>\n<td>Shaft seating at machine end<\/td>\n<td>Weekly<\/td>\n<\/tr>\n<tr>\n<td>Manual, concrete vibrator, AA\/AZ series (2022)<\/td>\n<td>Maintenance and lubrication with 10 to 15 g\/m of lithium-complex grease<\/td>\n<td>Every 500 operating hours (<a href=\"https:\/\/www.husqvarnaconstruction.com\/hcp\/tdrdownload\/pub000091443\/doc000216943\/1303237560?httproute=True\" rel=\"nofollow noopener noreferrer\" target=\"_blank\">German operating instruction<\/a>)<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>The spread from daily to 500 hours is the point. These devices differ in duty cycle, bend radius and environment, and the intervals differ accordingly. An engineer should read them as an indication of how much the application decides.<\/p>\n<h2 id=\"aerospace-installations-what-changes\">Aerospace installations: what changes<\/h2>\n<p>Flexible shafts in aerospace appear mainly where a mechanical drive has to be routed through a confined structure without a motor or gearbox at the point of action. Typical functions include:<\/p>\n<ul>\n<li><strong>Thrust reverser actuation:<\/strong> synchronization of several actuators through shafts that follow the nacelle structure.<\/li>\n<li><strong>Flap and slat actuation:<\/strong> transmission of rotation along the wing, with routing around ribs and fittings.<\/li>\n<li><strong>Valve override systems:<\/strong> manual or mechanical actuation of valves that are difficult to reach.<\/li>\n<li><strong>Synchronization shafts:<\/strong> keeping two or more drive points in step so that a surface moves without skew.<\/li>\n<\/ul>\n<p>The design constraints in these installations affect the inspection approach directly:<\/p>\n<ol>\n<li><strong>Confined routing.<\/strong> Bend radii are limited by the structure, so the shaft often runs near its permitted minimum. Inspection access to the middle of the route is often poor, which favors characteristics that can be checked at the ends and by function.<\/li>\n<li><strong>Low rotation, high torque peaks.<\/strong> Actuation shafts rotate little but see high torque at end stops or on jamming. A torque-based functional check at the interface can reveal winding set or lost stiffness.<\/li>\n<li><strong>Long standstill periods.<\/strong> Between operations the lubricant ages and the shaft may corrode in humid or temperature-cycling environments. Operational checks after long standstill are part of the plan.<\/li>\n<li><strong>Temperature and vibration.<\/strong> Wide temperature ranges and engine or airframe vibration affect lubricant, casing material and fittings.<\/li>\n<li><strong>Failure consequence.<\/strong> A shaft that is part of a safety-relevant function is assessed in the system safety analysis, which determines whether the interval is time-based and whether redundancy or monitoring is required.<\/li>\n<\/ol>\n<p>The applicable maintenance requirements for a specific aircraft come from the type\u2019s maintenance documentation and the approval basis. The shaft supplier\u2019s role is to provide the data the analysis needs: construction, torque capacity, bend radius limits, lubrication and expected wear behavior.<\/p>\n<h2 id=\"lubrication-and-operating-hours\">Lubrication and operating hours<\/h2>\n<p>Relubrication belongs in the same plan as inspection, because both address the same wear mechanism. The published values vary again with the application: one manual specifies lubrication every 500 operating hours at 10 to 15 g per meter with a specified grease (<a href=\"https:\/\/www.husqvarnaconstruction.com\/hcp\/tdrdownload\/pub000091443\/doc000216943\/1303237560?httproute=True\" rel=\"nofollow noopener noreferrer\" target=\"_blank\">German operating instruction, 2022<\/a>), another allows only a light film. The engineering conclusion is that quantity, grease type and interval belong in the shaft specification and are verified in the prototype test. Mixing greases or adding grease by judgment is a common source of overheating.<\/p>\n<p>For a practical maintenance routine at workshop level, the articles on the <a href=\"https:\/\/biax-flexwellen.de\/en\/flexible-shaft-maintenance-process-for-peak-performance\/\" target=\"_blank\" rel=\"noopener\">flexible shaft maintenance process<\/a> and <a href=\"https:\/\/biax-flexwellen.de\/en\/7-expert-flexible-shaft-maintenance-tips-for-engineers\/\" target=\"_blank\" rel=\"noopener\">maintenance tips for engineers<\/a> go through the individual steps.<\/p>\n<p><img decoding=\"async\" src=\"https:\/\/biax-flexwellen.de\/wp-content\/uploads\/2026\/11\/1795275180077_Lubrication-and-operating-hours.jpeg\" alt=\"Lubrication and operating hours\"><\/p>\n<h2 id=\"setting-the-interval-in-practice\">Setting the interval in practice<\/h2>\n<p>A workable sequence for design and process engineers:<\/p>\n<ol>\n<li><strong>Define the load case.<\/strong> Record nominal and peak torque, speed or cycle count, bend radii and environment.<\/li>\n<li><strong>Identify the failure modes.<\/strong> Core fatigue, casing wear, fitting loosening, lubricant loss, corrosion.<\/li>\n<li><strong>Run prototype tests under real conditions.<\/strong> Test with the actual routing, not a straight bench setup, and log torque, temperature and wear over time.<\/li>\n<li><strong>Fix acceptance limits.<\/strong> Define what counts as a finding, for example broken wires, winding gaps, kinks or torque deviation from the first-article reference.<\/li>\n<li><strong>Choose the interval basis.<\/strong> Operating hours for continuous rotation, cycles for actuation, calendar time for long standstill.<\/li>\n<li><strong>Start conservatively and adjust.<\/strong> Record findings per inspection and extend the interval only on documented evidence.<\/li>\n<li><strong>Feed back.<\/strong> Where findings cluster at one position, change the routing or the support, not only the interval.<\/li>\n<\/ol>\n<p>This order also keeps the specification consistent: the same data defines the shaft, the test and the inspection plan. Further background is available in the guide on <a href=\"https:\/\/biax-flexwellen.de\/en\/how-to-select-flexible-shafts-precision-machinery\/\" target=\"_blank\" rel=\"noopener\">how to select flexible shafts for precision machinery<\/a>.<\/p>\n<h2 id=\"storage-and-spare-shafts\">Storage and spare shafts<\/h2>\n<p>Spare shafts are part of the maintenance concept, since a shaft with a finding is replaced rather than repaired. Stock levels follow from the interval, the number of installed units and the lead time for the replacement.<\/p>\n<p><strong>Storage conditions.<\/strong> One manufacturer\u2019s manual calls for storage in a dry, frost-free, closed room after the equipment has been cleaned (<a href=\"https:\/\/www.husqvarnaconstruction.com\/hcp\/tdrdownload\/pub000091443\/doc000216943\/1303237560?httproute=True\" rel=\"nofollow noopener noreferrer\" target=\"_blank\">German operating instruction, 2022<\/a>). For lubricated spares in general, a plant maintenance article recommends relative humidity below 60% and a temperature between 60 and 90 \u00b0F, which is roughly 15 to 32 \u00b0C (Efficient Plant). The same article describes first in, first out handling for stored spares.<\/p>\n<p><strong>Handling.<\/strong> Store shafts at a bend radius no tighter than the permitted minimum, preferably in a large coil or straight in a tube. A shaft stored with a kink is a shaft with a finding. Keep end fittings capped to protect drive geometry and keep the casing away from sharp edges and solvents.<\/p>\n<p><strong>Documentation.<\/strong> Label each spare with type, length, configuration and delivery date. Where a shaft is custom configured, the drawing or specification number is the reference for reordering and for acceptance after installation.<\/p>\n<p><strong>Stock quantity.<\/strong> Base it on installed units, failure findings per interval and replacement lead time. For custom configurations the lead time often dominates, so an agreed buffer or a standard-component-based design reduces the stock required.<\/p>\n<p><img decoding=\"async\" src=\"https:\/\/biax-flexwellen.de\/wp-content\/uploads\/2026\/11\/1795275161353_Storage-and-spare-shafts.jpeg\" alt=\"Storage and spare shafts\"><\/p>\n<h2 id=\"relevant-biax-product-lines\">Relevant BIAX product lines<\/h2>\n<p>BIAX Flexwellen offers <a href=\"https:\/\/biax-flexwellen.de\/en\/product\/actuation-shafts\/\" target=\"_blank\" rel=\"noopener\">actuation shafts<\/a> for mechanical actuation tasks and <a href=\"https:\/\/biax-flexwellen.de\/en\/product\/custom-small-batch-solutions\/\" target=\"_blank\" rel=\"noopener\">custom and small-batch solutions<\/a> and prototypes for configurations defined by torque, speed, coupling interface and shaft design. Further product lines include flexible shaft cores by the meter, refined cores, drive and tool shafts and machine elements. The company works to ISO 9001.<\/p>\n<h2 id=\"perspective\">Perspective<\/h2>\n<blockquote>\n<p>From our side, the inspection interval is a question that should be answered at the start of the design, not after the first finding. The data needed is the same as for the shaft itself: torque, speed, routing, bend radius and environment.<\/p>\n<p>We design flexible shafts to the torque, speed, coupling and shaft design requirements of the customer. That is why we ask for the load case early and why a prototype test in the real routing is useful: it gives the inspection plan its first measured reference values.<\/p>\n<p>Intervals documented from the first-article test, extended only on recorded evidence, give the most reliable result in service.<\/p>\n<p><em>Uli<\/em><\/p>\n<\/blockquote>\n<h2 id=\"faq\">FAQ<\/h2>\n<h3 id=\"how-often-should-a-flexible-shaft-be-inspected\">How often should a flexible shaft be inspected?<\/h3>\n<p>There is no general value. The interval depends on load, speed, bend radius, routing and the consequence of failure. Published manuals range from daily casing checks to 500-hour lubrication intervals, so the value for your installation should be set from the load case and confirmed in prototype testing.<\/p>\n<h3 id=\"what-are-the-typical-signs-that-a-flexible-shaft-must-be-replaced\">What are the typical signs that a flexible shaft must be replaced?<\/h3>\n<p>Broken wires in the core, permanent deformation, heat discoloration, gaps between windings and permanent kinks or cuts in the casing are standard replacement criteria in manufacturer manuals. A loose end fitting or rising drive torque at constant load are early indicators that call for inspection.<\/p>\n<h3 id=\"should-inspection-be-based-on-operating-hours-or-calendar-time\">Should inspection be based on operating hours or calendar time?<\/h3>\n<p>For continuous rotation, operating hours describe wear well. For actuation shafts, count cycles and add a calendar interval because lubricant aging and corrosion progress during standstill. Many plans combine both and apply whichever limit is reached first.<\/p>\n<h3 id=\"how-should-spare-flexible-shafts-be-stored\">How should spare flexible shafts be stored?<\/h3>\n<p>Store them dry, clean and frost-free, at no tighter than the minimum bend radius, with end fittings protected. Label each spare with type, configuration and date, and issue the oldest first.<\/p>\n<h3 id=\"can-the-shaft-supplier-support-the-definition-of-the-inspection-plan\">Can the shaft supplier support the definition of the inspection plan?<\/h3>\n<p>Yes. With the load case, routing and environment, the shaft construction and its limits can be matched to the planned interval. Requests can be submitted through the BIAX contact page.<\/p>\n<h2 id=\"contact\">Contact<\/h2>\n<p>For questions on shaft configuration, load case or inspection requirements, technical inquiries can be sent via the <a href=\"https:\/\/biax-flexwellen.de\/\" target=\"_blank\" rel=\"noopener\">BIAX Flexwellen contact page<\/a>.<\/p>\n<h2 id=\"sources\">Sources<\/h2>\n<ul>\n<li><a href=\"https:\/\/service.multiquip.com\/pdfs\/Vibrator_Flex_Shaft_Identification.pdf\" rel=\"nofollow noopener noreferrer\" target=\"_blank\">Technical information, vibrator flex shaft identification<\/a><\/li>\n<li><a href=\"https:\/\/www.picotegroup.com\/hubfs\/Operating%20Manuals\/Maxi%20Miller%20Operating%20%26%20Safety%20Manual%20-%20March%202025.pdf\" rel=\"nofollow noopener noreferrer\" target=\"_blank\">Operating and safety manual, March 2025<\/a><\/li>\n<li><a href=\"https:\/\/www.husqvarnaconstruction.com\/hcp\/tdrdownload\/pub000091443\/doc000216943\/1303237560?httproute=True\" rel=\"nofollow noopener noreferrer\" target=\"_blank\">German operating instruction, 2022<\/a><\/li>\n<\/ul>\n<h2 id=\"recommended\">Recommended<\/h2>\n<ul>\n<li><a href=\"https:\/\/biax-flexwellen.de\/en\/7-expert-flexible-shaft-maintenance-tips-for-engineers\/\" target=\"_blank\" rel=\"noopener\">7 Expert Flexible Shaft Maintenance Tips for Engineers<\/a><\/li>\n<li><a href=\"https:\/\/biax-flexwellen.de\/en\/flexible-shaft-maintenance-process-for-peak-performance\/\" target=\"_blank\" rel=\"noopener\">Flexible Shaft Maintenance Process for Peak Performance<\/a><\/li>\n<li><a href=\"https:\/\/biax-flexwellen.de\/en\/prufverfahren-flexible-welle\/\" target=\"_blank\" rel=\"noopener\">Five Tests That Reveal Flexible Shaft Faults for Aerospace Engineers<\/a><\/li>\n<li><a href=\"https:\/\/biax-flexwellen.de\/en\/flexible-welle-schmierung\/\" target=\"_blank\" rel=\"noopener\">For Engineers: Flexible Shaft Lubrication for Shafts Above 10,000 rpm<\/a><\/li>\n<\/ul>\n<p><!-- biax-internal-links-v2 --><\/p>\n<div class=\"biax-internal-links\" style=\"margin: 2em 0;padding: 1.5em;background: #f8f9fa;border-left: 4px solid #0080C9\">\n<h3>Related Topics<\/h3>\n<ul>\n<li><a href=\"https:\/\/biax-flexwellen.de\/en\/product\/refined-flexible-shaft-cores\/\">Flexible Shafts (Refined)<\/a><\/li>\n<li><a href=\"https:\/\/biax-flexwellen.de\/en\/product\/custom-small-batch-solutions\/\">Custom Solutions<\/a><\/li>\n<li><a href=\"https:\/\/biax-flexwellen.de\/en\/industries-served\/\">Industries Served<\/a><\/li>\n<\/ul>\n<\/div>\n<div class=\"biax-cta-block\" style=\"margin: 2em 0;padding: 2em;background: #0080C9;color: #fff;text-align: center;border-radius: 8px\">\n<h3 style=\"color: #fff\">Send your spec inquiry<\/h3>\n<p style=\"color: #fff\">Custom flexible shafts for your application \u2014 we quote within 1 working day.<\/p>\n<p><a href=\"https:\/\/biax-flexwellen.de\/en\/contact\/\" style=\"padding: 0.8em 2em;background: #fff;color: #0080C9;text-decoration: none;font-weight: bold;border-radius: 4px\">Request Quote<\/a><\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>No universal inspection interval exists for flexible shafts. Learn how load, duty cycle and failure modes set the interval, with checks, lubrication and spares storage.<\/p>\n","protected":false},"author":7,"featured_media":9218,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":""},"categories":[1],"tags":[],"class_list":["post-9210","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-uncategorized"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.2 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Inspection Intervals for Flexible Shafts: How to Set Them<\/title>\n<meta name=\"description\" content=\"No universal inspection interval exists for flexible shafts. Learn how load, duty cycle and failure modes set the interval, with checks, lubrication and\u2026\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/biax-flexwellen.de\/en\/prufintervalle-flexible-welle\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Inspection Intervals for Flexible Shafts: How to Set Them\" \/>\n<meta property=\"og:description\" content=\"No universal inspection interval exists for flexible shafts. Learn how load, duty cycle and failure modes set the interval, with checks, lubrication and spares storage.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/biax-flexwellen.de\/en\/prufintervalle-flexible-welle\/\" \/>\n<meta property=\"og:site_name\" content=\"BIAX Flexwellen\" \/>\n<meta property=\"article:published_time\" content=\"2026-11-23T00:00:00+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-11-23T05:31:20+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/biax-flexwellen.de\/wp-content\/uploads\/2026\/11\/1795275092877_Flexible-shaft-assembly-laid-out-for-inspection.jpeg\" \/>\n\t<meta property=\"og:image:width\" content=\"1280\" \/>\n\t<meta property=\"og:image:height\" content=\"720\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"raidboxes\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"raidboxes\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"13 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/biax-flexwellen.de\\\/en\\\/prufintervalle-flexible-welle\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/biax-flexwellen.de\\\/en\\\/prufintervalle-flexible-welle\\\/\"},\"author\":{\"name\":\"raidboxes\",\"@id\":\"https:\\\/\\\/biax-flexwellen.de\\\/#\\\/schema\\\/person\\\/9bdb01e5097df8103b4a435177556003\"},\"headline\":\"Inspection Intervals for Flexible Shafts: How to Set Them\",\"datePublished\":\"2026-11-23T00:00:00+00:00\",\"dateModified\":\"2026-11-23T05:31:20+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/biax-flexwellen.de\\\/en\\\/prufintervalle-flexible-welle\\\/\"},\"wordCount\":2541,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/biax-flexwellen.de\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/biax-flexwellen.de\\\/en\\\/prufintervalle-flexible-welle\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/biax-flexwellen.de\\\/wp-content\\\/uploads\\\/2026\\\/11\\\/1795275092877_Flexible-shaft-assembly-laid-out-for-inspection.jpeg\",\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/biax-flexwellen.de\\\/en\\\/prufintervalle-flexible-welle\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/biax-flexwellen.de\\\/en\\\/prufintervalle-flexible-welle\\\/\",\"url\":\"https:\\\/\\\/biax-flexwellen.de\\\/en\\\/prufintervalle-flexible-welle\\\/\",\"name\":\"Inspection Intervals for Flexible Shafts: How to Set Them\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/biax-flexwellen.de\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/biax-flexwellen.de\\\/en\\\/prufintervalle-flexible-welle\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/biax-flexwellen.de\\\/en\\\/prufintervalle-flexible-welle\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/biax-flexwellen.de\\\/wp-content\\\/uploads\\\/2026\\\/11\\\/1795275092877_Flexible-shaft-assembly-laid-out-for-inspection.jpeg\",\"datePublished\":\"2026-11-23T00:00:00+00:00\",\"dateModified\":\"2026-11-23T05:31:20+00:00\",\"description\":\"No universal inspection interval exists for flexible shafts. Learn how load, duty cycle and failure modes set the interval, with checks, lubrication and spares storage.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/biax-flexwellen.de\\\/en\\\/prufintervalle-flexible-welle\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/biax-flexwellen.de\\\/en\\\/prufintervalle-flexible-welle\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/biax-flexwellen.de\\\/en\\\/prufintervalle-flexible-welle\\\/#primaryimage\",\"url\":\"https:\\\/\\\/biax-flexwellen.de\\\/wp-content\\\/uploads\\\/2026\\\/11\\\/1795275092877_Flexible-shaft-assembly-laid-out-for-inspection.jpeg\",\"contentUrl\":\"https:\\\/\\\/biax-flexwellen.de\\\/wp-content\\\/uploads\\\/2026\\\/11\\\/1795275092877_Flexible-shaft-assembly-laid-out-for-inspection.jpeg\",\"width\":1280,\"height\":720,\"caption\":\"Flexible shaft assembly laid out for inspection\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/biax-flexwellen.de\\\/en\\\/prufintervalle-flexible-welle\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Startseite\",\"item\":\"https:\\\/\\\/biax-flexwellen.de\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Inspection Intervals for Flexible Shafts: How to Set Them\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/biax-flexwellen.de\\\/#website\",\"url\":\"https:\\\/\\\/biax-flexwellen.de\\\/\",\"name\":\"BIAX Flexwellen\",\"description\":\"Empowering Industries with Flexible Shafts.\",\"publisher\":{\"@id\":\"https:\\\/\\\/biax-flexwellen.de\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/biax-flexwellen.de\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/biax-flexwellen.de\\\/#organization\",\"name\":\"BIAX Flexwellen\",\"alternateName\":\"Schmid & Wezel GmbH\",\"url\":\"https:\\\/\\\/biax-flexwellen.de\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/biax-flexwellen.de\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/biax-flexwellen.de\\\/wp-content\\\/uploads\\\/2026\\\/08\\\/biax-logo-1200.png\",\"contentUrl\":\"https:\\\/\\\/biax-flexwellen.de\\\/wp-content\\\/uploads\\\/2026\\\/08\\\/biax-logo-1200.png\",\"width\":1200,\"height\":339,\"caption\":\"BIAX Flexwellen\"},\"image\":{\"@id\":\"https:\\\/\\\/biax-flexwellen.de\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q142260637\",\"https:\\\/\\\/www.wlw.de\\\/de\\\/firma\\\/schmid-wezel-gmbh-307378\",\"https:\\\/\\\/www.europages.de\\\/SCHMID-WEZEL-GMBH-WERK-HILSBACH\\\/00000005275254-001\\\/produkte.html\"],\"description\":\"Industrieller Hersteller flexibler Wellen, biegsamer Antriebswellen und Werkzeugwellen seit \u00fcber 100 Jahren. Anwendungen: Automobil, Luft- und Raumfahrt, Schienenfahrzeuge, Medizintechnik, Maschinenbau, Lebensmittelverarbeitung.\",\"foundingDate\":\"1919\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Breite Stra\u00dfe 38\",\"addressLocality\":\"Sinsheim\",\"postalCode\":\"74889\",\"addressRegion\":\"Baden-W\u00fcrttemberg\",\"addressCountry\":\"DE\"},\"telephone\":\"+49 7260 9133-0\",\"email\":\"flexwellen@biax.de\",\"contactPoint\":{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"telephone\":\"+49 7260 9133-0\",\"email\":\"flexwellen@biax.de\",\"availableLanguage\":[\"de\",\"en\"],\"areaServed\":\"Worldwide\"},\"areaServed\":[\"DE\",\"AT\",\"CH\",\"IT\",\"US\",\"GB\",\"CA\",\"AU\",\"IN\",\"SG\",\"IL\"],\"knowsAbout\":[\"Flexible Wellen\",\"Biegsame Wellen\",\"Wellenseelen\",\"Werkzeugwellen\",\"Antriebstechnik\",\"Flexible Shaft Engineering\",\"High-Speed Tool Shafts\",\"Power Transmission\",\"Bet\u00e4tigungswellen\"],\"parentOrganization\":{\"@type\":\"Organization\",\"name\":\"Schmid & Wezel GmbH\",\"url\":\"https:\\\/\\\/www.biax.de\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/biax-flexwellen.de\\\/#\\\/schema\\\/person\\\/9bdb01e5097df8103b4a435177556003\",\"name\":\"raidboxes\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/fffce7a840bc223d86cdbe6a75e62363b4579fbebe5b3a3f71be4f05921b199c?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/fffce7a840bc223d86cdbe6a75e62363b4579fbebe5b3a3f71be4f05921b199c?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/fffce7a840bc223d86cdbe6a75e62363b4579fbebe5b3a3f71be4f05921b199c?s=96&d=mm&r=g\",\"caption\":\"raidboxes\"},\"url\":\"https:\\\/\\\/biax-flexwellen.de\\\/en\\\/author\\\/raidboxes\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Inspection Intervals for Flexible Shafts: How to Set Them","description":"No universal inspection interval exists for flexible shafts. Learn how load, duty cycle and failure modes set the interval, with checks, lubrication and\u2026","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/biax-flexwellen.de\/en\/prufintervalle-flexible-welle\/","og_locale":"en_US","og_type":"article","og_title":"Inspection Intervals for Flexible Shafts: How to Set Them","og_description":"No universal inspection interval exists for flexible shafts. Learn how load, duty cycle and failure modes set the interval, with checks, lubrication and spares storage.","og_url":"https:\/\/biax-flexwellen.de\/en\/prufintervalle-flexible-welle\/","og_site_name":"BIAX Flexwellen","article_published_time":"2026-11-23T00:00:00+00:00","article_modified_time":"2026-11-23T05:31:20+00:00","og_image":[{"width":1280,"height":720,"url":"https:\/\/biax-flexwellen.de\/wp-content\/uploads\/2026\/11\/1795275092877_Flexible-shaft-assembly-laid-out-for-inspection.jpeg","type":"image\/jpeg"}],"author":"raidboxes","twitter_card":"summary_large_image","twitter_misc":{"Written by":"raidboxes","Est. reading time":"13 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/biax-flexwellen.de\/en\/prufintervalle-flexible-welle\/#article","isPartOf":{"@id":"https:\/\/biax-flexwellen.de\/en\/prufintervalle-flexible-welle\/"},"author":{"name":"raidboxes","@id":"https:\/\/biax-flexwellen.de\/#\/schema\/person\/9bdb01e5097df8103b4a435177556003"},"headline":"Inspection Intervals for Flexible Shafts: How to Set Them","datePublished":"2026-11-23T00:00:00+00:00","dateModified":"2026-11-23T05:31:20+00:00","mainEntityOfPage":{"@id":"https:\/\/biax-flexwellen.de\/en\/prufintervalle-flexible-welle\/"},"wordCount":2541,"commentCount":0,"publisher":{"@id":"https:\/\/biax-flexwellen.de\/#organization"},"image":{"@id":"https:\/\/biax-flexwellen.de\/en\/prufintervalle-flexible-welle\/#primaryimage"},"thumbnailUrl":"https:\/\/biax-flexwellen.de\/wp-content\/uploads\/2026\/11\/1795275092877_Flexible-shaft-assembly-laid-out-for-inspection.jpeg","inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/biax-flexwellen.de\/en\/prufintervalle-flexible-welle\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/biax-flexwellen.de\/en\/prufintervalle-flexible-welle\/","url":"https:\/\/biax-flexwellen.de\/en\/prufintervalle-flexible-welle\/","name":"Inspection Intervals for Flexible Shafts: How to Set Them","isPartOf":{"@id":"https:\/\/biax-flexwellen.de\/#website"},"primaryImageOfPage":{"@id":"https:\/\/biax-flexwellen.de\/en\/prufintervalle-flexible-welle\/#primaryimage"},"image":{"@id":"https:\/\/biax-flexwellen.de\/en\/prufintervalle-flexible-welle\/#primaryimage"},"thumbnailUrl":"https:\/\/biax-flexwellen.de\/wp-content\/uploads\/2026\/11\/1795275092877_Flexible-shaft-assembly-laid-out-for-inspection.jpeg","datePublished":"2026-11-23T00:00:00+00:00","dateModified":"2026-11-23T05:31:20+00:00","description":"No universal inspection interval exists for flexible shafts. Learn how load, duty cycle and failure modes set the interval, with checks, lubrication and spares storage.","breadcrumb":{"@id":"https:\/\/biax-flexwellen.de\/en\/prufintervalle-flexible-welle\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/biax-flexwellen.de\/en\/prufintervalle-flexible-welle\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/biax-flexwellen.de\/en\/prufintervalle-flexible-welle\/#primaryimage","url":"https:\/\/biax-flexwellen.de\/wp-content\/uploads\/2026\/11\/1795275092877_Flexible-shaft-assembly-laid-out-for-inspection.jpeg","contentUrl":"https:\/\/biax-flexwellen.de\/wp-content\/uploads\/2026\/11\/1795275092877_Flexible-shaft-assembly-laid-out-for-inspection.jpeg","width":1280,"height":720,"caption":"Flexible shaft assembly laid out for inspection"},{"@type":"BreadcrumbList","@id":"https:\/\/biax-flexwellen.de\/en\/prufintervalle-flexible-welle\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Startseite","item":"https:\/\/biax-flexwellen.de\/en\/"},{"@type":"ListItem","position":2,"name":"Inspection Intervals for Flexible Shafts: How to Set Them"}]},{"@type":"WebSite","@id":"https:\/\/biax-flexwellen.de\/#website","url":"https:\/\/biax-flexwellen.de\/","name":"BIAX Flexwellen","description":"Empowering Industries with Flexible Shafts.","publisher":{"@id":"https:\/\/biax-flexwellen.de\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/biax-flexwellen.de\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/biax-flexwellen.de\/#organization","name":"BIAX Flexwellen","alternateName":"Schmid & Wezel GmbH","url":"https:\/\/biax-flexwellen.de\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/biax-flexwellen.de\/#\/schema\/logo\/image\/","url":"https:\/\/biax-flexwellen.de\/wp-content\/uploads\/2026\/08\/biax-logo-1200.png","contentUrl":"https:\/\/biax-flexwellen.de\/wp-content\/uploads\/2026\/08\/biax-logo-1200.png","width":1200,"height":339,"caption":"BIAX Flexwellen"},"image":{"@id":"https:\/\/biax-flexwellen.de\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q142260637","https:\/\/www.wlw.de\/de\/firma\/schmid-wezel-gmbh-307378","https:\/\/www.europages.de\/SCHMID-WEZEL-GMBH-WERK-HILSBACH\/00000005275254-001\/produkte.html"],"description":"Industrieller Hersteller flexibler Wellen, biegsamer Antriebswellen und Werkzeugwellen seit \u00fcber 100 Jahren. Anwendungen: Automobil, Luft- und Raumfahrt, Schienenfahrzeuge, Medizintechnik, Maschinenbau, Lebensmittelverarbeitung.","foundingDate":"1919","address":{"@type":"PostalAddress","streetAddress":"Breite Stra\u00dfe 38","addressLocality":"Sinsheim","postalCode":"74889","addressRegion":"Baden-W\u00fcrttemberg","addressCountry":"DE"},"telephone":"+49 7260 9133-0","email":"flexwellen@biax.de","contactPoint":{"@type":"ContactPoint","contactType":"sales","telephone":"+49 7260 9133-0","email":"flexwellen@biax.de","availableLanguage":["de","en"],"areaServed":"Worldwide"},"areaServed":["DE","AT","CH","IT","US","GB","CA","AU","IN","SG","IL"],"knowsAbout":["Flexible Wellen","Biegsame Wellen","Wellenseelen","Werkzeugwellen","Antriebstechnik","Flexible Shaft Engineering","High-Speed Tool Shafts","Power Transmission","Bet\u00e4tigungswellen"],"parentOrganization":{"@type":"Organization","name":"Schmid & Wezel GmbH","url":"https:\/\/www.biax.de\/"}},{"@type":"Person","@id":"https:\/\/biax-flexwellen.de\/#\/schema\/person\/9bdb01e5097df8103b4a435177556003","name":"raidboxes","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/fffce7a840bc223d86cdbe6a75e62363b4579fbebe5b3a3f71be4f05921b199c?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/fffce7a840bc223d86cdbe6a75e62363b4579fbebe5b3a3f71be4f05921b199c?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/fffce7a840bc223d86cdbe6a75e62363b4579fbebe5b3a3f71be4f05921b199c?s=96&d=mm&r=g","caption":"raidboxes"},"url":"https:\/\/biax-flexwellen.de\/en\/author\/raidboxes\/"}]}},"_links":{"self":[{"href":"https:\/\/biax-flexwellen.de\/en\/wp-json\/wp\/v2\/posts\/9210","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/biax-flexwellen.de\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/biax-flexwellen.de\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/biax-flexwellen.de\/en\/wp-json\/wp\/v2\/users\/7"}],"replies":[{"embeddable":true,"href":"https:\/\/biax-flexwellen.de\/en\/wp-json\/wp\/v2\/comments?post=9210"}],"version-history":[{"count":3,"href":"https:\/\/biax-flexwellen.de\/en\/wp-json\/wp\/v2\/posts\/9210\/revisions"}],"predecessor-version":[{"id":9224,"href":"https:\/\/biax-flexwellen.de\/en\/wp-json\/wp\/v2\/posts\/9210\/revisions\/9224"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/biax-flexwellen.de\/en\/wp-json\/wp\/v2\/media\/9218"}],"wp:attachment":[{"href":"https:\/\/biax-flexwellen.de\/en\/wp-json\/wp\/v2\/media?parent=9210"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/biax-flexwellen.de\/en\/wp-json\/wp\/v2\/categories?post=9210"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/biax-flexwellen.de\/en\/wp-json\/wp\/v2\/tags?post=9210"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}